Germany Defence Procurement 2026: How Suppliers Find Bundeswehr Opportunities
Also available in: Deutsch
Germany is running the largest defence build-up in its post-war history: total defence spending reaches €108 billion in 2026, of which roughly €48 billion is actual procurement flowing to industry. For suppliers, the questions are practical — where are the tenders published, what did the 2026 acceleration law change, and how does a smaller firm get in? This guide answers each.
Key takeaway
To find German or Bundeswehr defence tenders, monitor three official channels: TED (ted.europa.eu) for all EU above-threshold notices, the federal e-Vergabe platform (evergabe-online.de) where BAAINBw and BAIUDBw publish, and service.bund.de. Registration is free; filter by 'BAAINBw', 'Verteidigung' or CPV codes. Most SMEs also pursue subcontracting with primes and register with NATO's NSPA.
| Channel | What appears there | Cost to bidders |
|---|---|---|
| TED (ted.europa.eu) | All EU above-threshold notices, including defence and security (VSVgV) | Free |
| e-Vergabe (evergabe-online.de) | Where BAAINBw (weapons, IT) and BAIUDBw (infrastructure, services) publish | Free |
| service.bund.de | Federal tender aggregator, including below-threshold notices | Free |
| DTVP (dtvp.de) | Länder, municipal and Bundeswehr garrison / construction works | Free for bidders |
| Prime supplier portals | Subcontracting into Rheinmetall, KNDS, Diehl, Hensoldt and TKMS programmes | Free |
| NSPA (eportal.nspa.nato.int) | NATO solicitations; registration issues a NATO CAGE code | Free |
Germany's defence spending in 2026
The 2026 defence budget combines a regular budget (Einzelplan 14) of about €82.7 billion with a €25.5 billion drawdown from the Bundeswehr special fund (Sondervermögen), for total defence spending of roughly €108 billion — the largest single-year jump in the Federal Republic's history. The number that matters most to suppliers is military procurement: about €47.9 billion in 2026 (€22.4 billion from the regular budget plus the €25.5 billion special fund), the money actually flowing to industry.
You will also see a much larger figure quoted — a €377 billion ($438bn) acquisition list of some 320 planned projects. Treat that as a directional planning pipeline from a leaked internal document, not a set of firm orders: many items have no timeline, and German firms are reported to hold the bulk of the projects that already have confirmed contractors.
€108bn
total German defence spending in 2026
€47.9bn
of that is procurement flowing to industry
€432,000
EU threshold above which defence supply/service tenders must be advertised
Where German defence tenders are published
Two federal offices do most of the buying. BAAINBw (the Federal Office for Bundeswehr Equipment, Information Technology and In-Service Support, in Koblenz) procures weapons systems, equipment and IT. BAIUDBw handles infrastructure, construction, services and commercial goods — barracks, depots and garrison works — and is often a lower-barrier channel for SMEs. The Bundeswehr's in-house IT company, BWI, runs much of the digitisation work.
Their notices are spread across the channels in the table above. The single most complete source for large contracts is TED, which carries every above-threshold (Oberschwelle) notice; the federal e-Vergabe platform at evergabe-online.de is where BAAINBw and BAIUDBw actually publish and receive bids, free of charge. For infrastructure and civil-supply work, DTVP and the Länder portals matter too.
How to search e-Vergabe and TED
The dividing line in German procurement is the EU threshold — Oberschwelle versus Unterschwelle. Above the threshold (from €432,000 for defence and security supplies and services, €5.4 million for works), contracts follow the GWB Part 4 regime and the defence-and-security regulation VSVgV, and must be published on TED. Below it, national rules (UVgO for supplies and services, VOB/A for works) apply and notices appear on national and regional platforms.
On e-Vergabe, the fastest way to surface Bundeswehr work is to filter by the issuer 'BAAINBw' or the keyword 'Verteidigung', and by CPV codes — 35000000 for security and defence equipment, 35400000 for military vehicles. Register once (free) to download tender documents and submit electronically.
Ready to see it in action?
Set up in minutes. 14-day free trial.
The 2026 acceleration law: what changed
In force since 14 February 2026, the Planning and Procurement Acceleration Act (Bundeswehrplanungs- und -beschaffungsbeschleunigungsgesetz, or BwPBBG) rewired defence buying to prioritise speed. It permits negotiated procedures without a call for competition, shortened deadlines, interim and partial awards, and advance payments, and it adds 'Europe first' levers: under §11, buyers may restrict participation to EU or EEA firms and require minimum EU-origin content.
One point to correct a common misreading: the law is speed-first, not SME-first. Its headline instrument suspends the usual duty to divide contracts into lots (§97(4) of the GWB) — the very rule that normally protects the Mittelstand — so large bundled awards to primes become easier. For SMEs, that makes prime relationships more important, not less. And the picture is still unsettled: a provision removing the automatic suspension of contested awards (§16) was referred to the Federal Constitutional Court in May 2026, so the remedies available to a losing bidder are, for now, uncertain. The separate €25-million parliamentary approval threshold for large contracts was not changed by this law.
How an SME gets in
The realistic routes for a smaller firm are:
- Target BAIUDBw work — infrastructure, logistics, medical, clothing and facility services carry lower barriers than weapons programmes, and much of it is issued below threshold via regional authorities;
- Subcontract to the primes — register on the supplier portals of Rheinmetall, KNDS Deutschland, Diehl Defence, Hensoldt, TKMS and Airbus, and target components in demand: energetics, electronics, sensors and counter-drone sub-systems. The lot-bundling above makes this route more important;
- Register with NSPA — the NATO Support and Procurement Agency's free Source File registration issues a NATO CAGE code and lets you be invited to multinational solicitations;
- Get the clearances ready — sensitive lots require facility and personnel security clearance (Sicherheitsüberprüfung), and 'Eignung' evidence — references, financial standing, capacity — is expected everywhere.
The big programmes to watch
The 2026 pipeline is weighted toward a handful of priorities. In the air and missile-defence domain — a top political priority — the European Sky Shield Initiative, Diehl's IRIS-T systems and Arrow 3 dominate. On land, the Leopard 2A8 tank, the Puma infantry fighting vehicle, the RCH-155 howitzer and the Rheinmetall-led Skyranger counter-drone system are the big lines, alongside a major 155mm ammunition ramp-up. At sea, the F126, F127 and newly approved F128 frigates and U212CD submarines lead. And across the force, the D-LBO battlefield-digitisation programme — including tens of thousands of new radios — is reshaping communications. Much of this value flows to primes, but each programme pulls a long tail of component and service subcontracts.
Don't miss a Bundeswehr notice
German defence notices are scattered across TED, e-Vergabe, service.bund.de, DTVP and the Länder portals, and the highest-value work often sits behind issuer names and CPV codes you have to know to search for. Checking each platform by hand, in German, is where opportunities slip.
Jorpex monitors TED and 50+ national and regional portals — DTVP and the German platforms among them — with keyword, issuer, CPV and value filters, and delivers matches to Slack or email the day they publish. It sits alongside the wider EU defence funding picture and programmes like EDIP, and complements our general guide to finding tenders in Germany.